Zughotel by RailAdventure
Before rail vehicles can be delivered to the end customer, they usually have to undergo a demanding and, above all, lengthy test and approval phase. However, this is the period when prototypes need a home base as the future client depot is often not (yet) available for activities such as setting up the measurement technology or testing and maintenance work, or the new trains would disrupt the regular routines there. This is what we are here for and so we warmly welcome our customers and their vehicles to our “Zughotel” (hotel for trains) in Braunschweig. A safe haven not just for the trains, but also for the people looking after them.
Infrastructure at the Zughotel
WORKSHOP
WHEELSET CHANGING INSTALLATION
WAREHOUSE
FORKLIFT
ROOF WORKING STANDS
RAIL PITS
TEMPORARY STORAGE
SPRINKLER SYSTEM
MEETINGS
OFFICE
24/7 SECURITY
BISTRO
LEVELED TRACK
CRANE
TEST TRACK
FROM 2025
TOOL RENTAL
PAINT BOOTH
GARDEN
All about wheels
WHEEL SET DIAGNOSIS
UNDERFLOOR LATHE
FROM 2025
Proof of derailment safety as per EN 14363
JACK SYSTEM
150 M CURVE
FROM 2025
At the centre of the transport corridor
• 73 kilometres to Hannover airport
• 220 kilometres from Berlin
• Right by the A2 motorway
• Braunschweig ICE railway station