• RailAdventure Zughotel Logo VT 601
  • RailAdventure Zughotel VT 601
  • RailAdventure Zughotel Besprechungsraum
  • Zughotel by RailAdventure Kran Radsatz VT 601
  • Zughotel by RailAdventure Büro-Arbeitsplätze
  • Zughotel by RailAdventure Lagerräume
  • Zughotel by RailAdventure Bahnsteig VT601
  • Zughotel by RailAdventure Kurzzeitarbeitsplätze
  • RailAdventure Zughotel Radsatzdiagnose

Zughotel by RailAdventure

Before rail vehicles can be delivered to the end customer, they usually have to undergo a demanding and, above all, lengthy test and approval phase. However, this is the period when prototypes need a home base as the future client depot is often not (yet) available for activities such as setting up the measurement technology or testing and maintenance work, or the new trains would disrupt the regular routines there. This is what we are here for and so we warmly welcome our customers and their vehicles to our “Zughotel” (hotel for trains) in Braunschweig. A safe haven not just for the trains, but also for the people looking after them.

Infrastructure at the Zughotel

Zughotel by RailAdventure Werkstatt

WORKSHOP

Zughotel-Radsatzsenke

WHEELSET CHANGING INSTALLATION

Zughotel-Lager

WAREHOUSE

Zughotel-Gabelstapler

FORKLIFT

Zughotel-Dacharbeitsstand

ROOF WORKING STANDS

Gleis mit Grube

RAIL PITS

Zughotel-Abstellen

TEMPORARY STORAGE

Zughotel-Berieselungsanlage

SPRINKLER SYSTEM

Zughotel-Besprechung

MEETINGS

Zughotel-Büro

OFFICE

Zughotel-Security

24/7 SECURITY

Zughotel-Bistro

BISTRO

Zughotel by RailAdventure Nullgleis, nivelliertes Gleis

LEVELED TRACK

Zughotel by RailAdventure Kran

CRANE

RailAdventure Zughotel Testgleis

TEST TRACK

FROM 2025

Zughotel by RailAdventure Werkzeugverleih

TOOL RENTAL

Zughotel by RailAdventure Nullgleis

PAINT BOOTH

Zughotel by RailAdventure Nullgleis

GARDEN

All about wheels

RailAdventure Zughotel Radsatzdiagnose

WHEEL SET DIAGNOSIS

Zughotel-Unterflurdrehbank

UNDERFLOOR LATHE

FROM 2025

Proof of derailment safety as per EN 14363

Zughotel-Hubbockanlage

JACK SYSTEM

RailAdventure Zughotel 150-Meter-Bogen

150 M CURVE

FROM 2025

At the centre of the transport corridor

RailAdventure Zughotel Braunschweig

• 73 kilometres to Hannover airport

• 220 kilometres from Berlin

• Right by the A2 motorway

• Braunschweig ICE railway station