Zughotel by RailAdventure
Before rail vehicles can be delivered to the end customer, they usually have to undergo a demanding and, above all, lengthy test and approval phase. However, this is the period when prototypes need a home base as the future client depot is often not (yet) available for activities such as setting up the measurement technology or testing and maintenance work, or the new trains would disrupt the regular routines there. This is what we are here for and so we warmly welcome our customers and their vehicles to our “Zughotel” (hotel for trains) in Braunschweig. A safe haven not just for the trains, but also for the people looking after them.
Infrastructure at the Zughotel

WORKSHOP

WHEELSET CHANGING INSTALLATION

WAREHOUSE

FORKLIFT

ROOF WORKING STANDS

RAIL PITS

TEMPORARY STORAGE

SPRINKLER SYSTEM

MEETINGS

OFFICE

24/7 SECURITY

BISTRO

LEVELED TRACK

CRANE

TEST TRACK
FROM 2025

TOOL RENTAL

PAINT BOOTH

GARDEN
All about wheels

WHEEL SET DIAGNOSIS

UNDERFLOOR LATHE
Proof of derailment safety as per EN 14363

JACK SYSTEM

150 M CURVE
FROM 2025
At the centre of the transport corridor

• 73 kilometres to Hannover airport
• 220 kilometres from Berlin
• Right by the A2 motorway
• Braunschweig ICE railway station